SRC Infrastructure was commissioned to design and assure proposed CRMS routes on the Jubilee and Northern Line’s Upgrade Programme. The scope was to manage, design and assure the Cable Route Management Systems (CRMS) for the power, signalling and communications cables.


Key activities included:

  • the design of over track crossing arrangements

  • new post routes

  • extension of the existing post routes

  • earthing and bonding arrangements.

During this project SRC Infrastructure, with London Underground, developed a set of generic template CRMS solutions which are now issued as approved “best practice” designs.